Check site photos against the construction programme
For: Construction project manager or owner's representative tracking progress across sites
The pain today
Progress is reported as a percentage in a spreadsheet. Thousands of dated site photos exist but nobody compares them with the programme, so slippage and out-of-sequence work show up at the next valuation.
The ask
“I attached this month's dated site photos by zone, the construction programme and the drawings list. For each zone, tell me what work the photos show as started, complete or absent against the programme, with the photos behind each finding.”
Plain words, as you would say it to a colleague. Edit it to fit your case before you send it.
What you attach or connect
- Dated site photos by zone
- Construction programme
- Drawings list and zone plan
- Previous progress report
The unit of work
One worker task per one zone's photo set for one period.
Why a swarm fits
Each zone and period is judged from its own photos against a few programme activities. Zones are independent, and only the reconciler needs the whole programme.
Not for
Measuring quantities or certifying payment. Photos show that work is present, not its quality or measured extent.
The decision tree
5 typed decisions, each with an action for every answer
At fixed moments in a run, the engine puts one narrow question to a decision model. The decision model never writes text: it answers yes or no with a probability, picks from listed options, or gives a score, about a small slice of the material. The engine then does exactly what this tree says, which is what makes the run auditable. The thresholds are the template's design values, not measured results.
Planner, while planning
Scope checkA choice among options
Before work starts on a unit
Does the description of this zone's photo set say the photos are dated within the period and show the named zone?
Sees only: Planned design: one zone and period, with the perception model's written description of the photo set
Why: Planned: zones without usable photos are reported as unassessed rather than as showing no work.
- Dated and in zonethenAccept
- Undated or wrong zonethenSkip this unit
- Too few photos to judgethenMark unresolved
Before workers, before a task runs
Small worker or strong modelYes or no, with a probability
Before a task runs
Is this programme activity one whose start or completion would be visible in a photograph, rather than concealed or internal work?
Sees only: One programme activity's description
Why: Planned: concealed work is marked not observable instead of spending perception effort on it.
- Yes: 0.60 or higherthenAccept
- Unsure: 0.30 up to 0.60thenEscalate to a strong model
- No: below 0.30thenSkip this unit
After workers, the judge checks
Evidence checkYes or no, with a probability
After a worker answers
Does the written description of what the cited photos show support the status given to this programme activity: started, complete or not visible?
Sees only: Planned design: one activity, its stated status and the description of the cited photos
Why: Planned: a status must follow from what was described, not from what the programme expects.
- Yes: 0.85 or higherthenAccept
- Unsure: 0.50 up to 0.85thenMark unresolved
- No: below 0.50thenReject and retry
Reconciler, while merging
Conflict checkYes or no, with a probability
While reconciling
Does the observed status of this activity disagree with the status in the contractor's progress report for the same period?
Sees only: One activity's verified observed status and its line in the progress report
Why: Planned: the disagreement is shown to the project manager, never silently corrected.
- Yes: 0.70 or higherthenMark unresolved
- Unsure: 0.30 up to 0.70thenMark unresolved
- No: below 0.30thenAccept
Accountable person, before anything is settled
Person decidesYes or no, with a probability
Before anything is reported as settled
Does this finding differ from reported progress or show work out of programme sequence, so that it could bear on a valuation or notice?
Sees only: One zone's findings with photo references
Why: Planned: the project manager and quantity surveyor confirm on site before money or notices move.
Accountable: The project manager and quantity surveyor confirm progress on site before any valuation or notice.
- Yes: 0.30 or higherthenAsk a person
- Unsure: 0.10 up to 0.30thenAsk a person
- No: below 0.10thenAccept
The fleet: who does what
Model tiers by role, not brands: you choose the models. Strong reasoning models plan and reconcile, small fast models do the wide work, and the judge is a decision model from a different family, so it does not share the workers' blind spots.
Planner
A strong reasoning model turns the programme into visible activities per zone and period.
Decisions here:1. Scope check
Workers
A perception model for video and images, planned, one task per zone, describing visible work with photo references.
Designed for 30 to 800 agents, one worker task per one zone's photo set for one period. Each worker receives only its own unit.
Decisions here:2. Small worker or strong model
Judge, from a different model family
A decision model from a different family checks that each described observation supports the stated activity status.
Decisions here:3. Evidence check
Reconciler
A strong reasoning model compares observed status with the programme and the reported percentage.
Decisions here:4. Conflict check
Accountable person
The project manager and quantity surveyor confirm progress on site before any valuation or notice.
Decisions here:5. Person decides
Checked before anything is accepted
- Every status cites the photos it rests on, with date and zone
- Activities that cannot be seen in photos are marked not observable, not absent
- Zones with too few or undated photos are reported as unassessed
- Disagreement with the reported progress is shown, never silently corrected
What comes back
- Per zone: activities seen as started, complete or not visible
- Differences from the reported progress, with photos
- Work seen out of programme sequence
- Zones without usable photo coverage
What to measure
- Share of findings confirmed on a site walk
- Slippage identified before the valuation versus at it
- Project team hours per progress report
- Cost per zone assessed
Names of measures only. No result is claimed for this template.
Templates open in the workspace chat with the ask filled in. Nothing runs until you send it.
Get early accessSign in to useMore in Physical AI and field operations
Roll up drone inspection footage across an asset network
For: Asset integrity manager for overhead lines, pipelines or telecom towers
Drone flights return footage for every span and tower.
Review plant walkdown video from four specialist angles
For: Site HSE manager or operations manager at a process or manufacturing plant
Walkdowns are filmed but reviewed by one person with one checklist.
Test the explanation for recurring robot fleet stoppages
For: Warehouse automation engineer or robotics operations lead
Mobile robots stop in the same aisles.