Check tender bids against every mandatory and scored requirement
For: Sourcing manager or chair of a tender evaluation committee running a formal RFP
The pain today
Each bid runs to hundreds of pages of technical, commercial, legal and sustainability annexes. Evaluators skim and score unevenly, and a missed mandatory requirement surfaces after award, when the decision can be challenged.
The ask
“I attached our RFP with the requirement list and scoring criteria, and the bids we received. For each bid, check every mandatory requirement and tell me where the answer is missing, partial or contradicted elsewhere in the same bid. Show the page you relied on.”
Plain words, as you would say it to a colleague. Edit it to fit your case before you send it.
What you attach or connect
- RFP with numbered requirements and scoring criteria
- Bid documents and annexes per bidder
- Clarification questions and answers
- Evaluation committee briefs per discipline
The unit of work
One worker task per one requirement in one bid, per reviewer brief.
Why a swarm fits
Each requirement is answered in a small part of one bid, and bidders are independent. Technical, commercial, legal and sustainability reviewers read the same passage against different checklists.
Not for
A quotation decided on price alone, or a few short bids: a comparison spreadsheet is cheaper and fully adequate.
The decision tree
5 typed decisions, each with an action for every answer
At fixed moments in a run, the engine puts one narrow question to a decision model. The decision model never writes text: it answers yes or no with a probability, picks from listed options, or gives a score, about a small slice of the material. The engine then does exactly what this tree says, which is what makes the run auditable. The thresholds are the template's design values, not measured results.
Planner, while planning
Scope checkYes or no, with a probability
Before work starts on a unit
Is this requirement marked mandatory or scored in the RFP, as opposed to background information for bidders?
Sees only: One numbered RFP requirement with its heading and weighting column
Why: Avoids assessing every bid against text that carries no evaluation weight.
- Yes: 0.60 or higherthenAccept
- Unsure: 0.30 up to 0.60thenAccept
- No: below 0.30thenSkip this unit
Before workers, before a task runs
Small worker or strong modelYes or no, with a probability
Before a task runs
Does assessing this requirement need more than one reviewer brief, for example a technical answer that depends on a pricing or legal annex?
Sees only: The requirement text and the bid's table of contents
Why: Sends a requirement to several specialists only where one brief cannot judge it.
- Yes: 0.60 or higherthenSplit the work
- Unsure: 0.35 up to 0.60thenSplit the work
- No: below 0.35thenAccept
After workers, the judge checks
Evidence checkYes or no, with a probability
After a worker answers
Does the quoted bid passage commit the bidder to meet this requirement, rather than describe a capability, an option or an intention?
Sees only: The requirement, the quoted bid passage and its page reference
Why: A capability statement read as a commitment is how a non-compliant bid gets through.
- Yes: 0.85 or higherthenAccept
- Unsure: 0.50 up to 0.85thenEscalate to a strong model
- No: below 0.50thenReject and retry
Reconciler, while merging
Conflict checkA choice among options
While reconciling
Does this other passage of the same bid, such as a pricing assumption or a legal reservation, take back what the answer promises?
Sees only: The answering passage and one candidate passage from another annex of the same bid
Why: Bids often promise in the technical annex what they withdraw in the assumptions.
- Takes back or limits the promisethenMark unresolved
- Consistent with the promisethenAccept
- About something elsethenAccept
Accountable person, before anything is settled
Person decidesYes or no, with a probability
Before anything is reported as settled
Would this assessment mark a mandatory requirement as not met or only partly met, which could exclude the bidder?
Sees only: The assessment, its evidence and the requirement's mandatory flag
Why: Exclusion is the committee's decision and can be challenged in law.
Accountable: The evaluation committee owns every score and the award decision; the swarm prepares evidence and never ranks bidders.
- Yes: 0.40 or higherthenAsk a person
- Unsure: 0.15 up to 0.40thenAsk a person
- No: below 0.15thenAccept
The fleet: who does what
Model tiers by role, not brands: you choose the models. Strong reasoning models plan and reconcile, small fast models do the wide work, and the judge is a decision model from a different family, so it does not share the workers' blind spots.
Planner
A strong reasoning model assigns each requirement to the reviewer briefs that own it and locates the answering sections per bid.
Decisions here:1. Scope check
Workers
Small fast workers, each holding one brief (technical, commercial, legal, sustainability), assess one requirement in one bid.
Designed for 8 to 300 agents, one worker task per one requirement in one bid, per reviewer brief. Each worker receives only its own unit.
Decisions here:2. Small worker or strong model
Judge, from a different model family
A decision model from a different family checks that the cited bid passage supports 'met', 'partial' or 'not met'.
Decisions here:3. Evidence check
Reconciler
A strong reasoning model builds the compliance matrix per bidder and keeps reviewer disagreements visible side by side.
Decisions here:4. Conflict check
Accountable person
The evaluation committee owns every score and the award decision; the swarm prepares evidence and never ranks bidders.
Decisions here:5. Person decides
Checked before anything is accepted
- Each assessment quotes the bid passage and page it rests on
- Answers are checked against pricing and legal annexes for contradictions within the bid
- The same requirement is read with the same checklist for every bidder
- Requirements with no located answer are listed, never assumed met
What comes back
- Compliance matrix per bidder with quoted evidence
- Mandatory requirements that are missing, partial or contradicted
- Clarification questions to send to each bidder
- Points where reviewer briefs disagree about the same answer
What to measure
- Mandatory gaps found by the committee that the swarm missed
- Evaluator hours per bid
- Consistency of assessments for the same requirement across bidders
Names of measures only. No result is claimed for this template.
Templates open in the workspace chat with the ask filled in. Nothing runs until you send it.
Get early accessSign in to useMore in Procurement and supply chain
Reconcile agreed terms across supplier contracts and amendments
For: Procurement lead or category manager preparing renewals or a supplier performance review
The price, delivery date and penalty that apply to each supplier are spread over a master agreement, amendments and emails.
Check invoiced prices against contract price lists and indexation
For: Procurement controller or accounts payable lead responsible for contract compliance of spend
Invoices are matched to purchase orders, not to the contract.
Watch the supplier base for insolvency, certificate and owner changes
For: Supplier risk manager or head of procurement with single-sourced or regulated suppliers
Supplier risk is assessed at onboarding and then left.