Find conflicts between specifications, schedules and drawing notes
For: Design manager or lead consultant coordinating disciplines before tender or construction issue
The pain today
Architectural, structural and services documents are written by different teams. A fire rating, product standard or tolerance in the specification differs from the door schedule or a drawing note, and the clash becomes a site query or a claim.
The ask
“Go through the specification sections, schedules and drawing notes for this project. Working discipline by discipline and section by section, find every place where two documents state different requirements for the same element, and quote both with their revision.”
Plain words, as you would say it to a colleague. Edit it to fit your case before you send it.
What you attach or connect
- Specification sections as text
- Door, finishes and equipment schedules
- Drawing notes and legends extracted as text
- Document register with revisions
The unit of work
One worker task per one specified element across its documents.
Why a swarm fits
The set is a tree: project, discipline, section, element. A leaf needs only the few passages that mention one element. Elements are independent, and each level is checked before it rolls up.
Not for
Geometric clash detection or anything that lives only in the drawing geometry. It reads text, not drawings or models.
The decision tree
6 typed decisions, each with an action for every answer
At fixed moments in a run, the engine puts one narrow question to a decision model. The decision model never writes text: it answers yes or no with a probability, picks from listed options, or gives a score, about a small slice of the material. The engine then does exactly what this tree says, which is what makes the run auditable. The thresholds are the template's design values, not measured results.
Planner, while planning
Split or keep serialYes or no, with a probability
While planning
Does the document register list separate specification sections and schedules for this discipline that can be read independently?
Sees only: One discipline's rows in the document register
Why: Splits by section only where the register shows separable documents.
- Yes: 0.60 or higherthenSplit the work
- Unsure: 0.40 up to 0.60thenKeep serial
- No: below 0.40thenKeep serial
Split or keep serialYes or no, with a probability
While planning
Does this specification section name distinct elements, such as door types or equipment tags, that also appear in a schedule or drawing note index?
Sees only: The section's element list and the schedule and note index
Why: Creates one leaf per element only when the element is mentioned in more than one place.
- Yes: 0.60 or higherthenSplit the work
- Unsure: 0.40 up to 0.60thenKeep serial
- No: below 0.40thenKeep serial
Scope checkYes or no, with a probability
Before work starts on a unit
Is this document revision the current one in the register, not marked superseded?
Sees only: One document's revision block and its register row
Why: Excludes superseded sheets so old conflicts are not reported again.
- Yes: 0.60 or higherthenAccept
- Unsure: 0.30 up to 0.60thenEscalate to a strong model
- No: below 0.30thenSkip this unit
After workers, the judge checks
Evidence checkA choice among options
After a worker answers
Do the two quoted statements refer to the same element tag or type, in the same location or condition?
Sees only: Two quoted statements with their document references
Why: Prevents false clashes between statements that were never about the same thing.
- Same element and conditionthenAccept
- Same element, different location or conditionthenSkip this unit
- Cannot tell from the quotesthenEscalate to a strong model
Reconciler, while merging
Conflict checkA choice among options
While reconciling
Do the two statements give different fire ratings, product standards, materials, sizes or tolerances for that element?
Sees only: Two statements already confirmed as the same element
Why: Turns every real difference into a coordination query with both quotes attached.
- Same requirementthenAccept
- Different requirementthenMark unresolved
- One is silentthenMark unresolved
Accountable person, before anything is settled
Person decidesYes or no, with a probability
Before anything is reported as settled
Does the conflict concern fire rating, structure, escape, accessibility or a building services safety device?
Sees only: One conflict with both quotes
Why: The lead designer and the licensed engineer or architect resolve every conflict; the swarm picks no side.
Accountable: The lead designer and the responsible licensed engineer or architect own the resolution of every conflict.
- Yes: 0.40 or higherthenAsk a person
- Unsure: 0.15 up to 0.40thenAsk a person
- No: below 0.15thenAccept
The fleet: who does what
Model tiers by role, not brands: you choose the models. Strong reasoning models plan and reconcile, small fast models do the wide work, and the judge is a decision model from a different family, so it does not share the workers' blind spots.
Planner
A strong reasoning model builds the tree from the document register and indexes where each element is mentioned.
Decisions here:1. Split or keep serial2. Split or keep serial3. Scope check
Workers
Small fast workers from an open-weight family compare the stated requirements for one element across its documents.
Designed for 30 to 500 agents, one worker task per one specified element across its documents. Each worker receives only its own unit.
Judge, from a different model family
A decision model from a different family decides whether two statements truly conflict or describe different conditions.
Decisions here:4. Evidence check
Reconciler
A strong reasoning model rolls conflicts up by section and discipline and drafts coordination queries.
Decisions here:5. Conflict check
Accountable person
The lead designer and the responsible licensed engineer or architect own the resolution of every conflict.
Decisions here:6. Person decides
Checked before anything is accepted
- Each conflict quotes both documents with revision and location
- Statements are compared only when they refer to the same element and condition
- Superseded revisions in the register are excluded before comparison
What comes back
- Conflict list per element with both quotes
- Draft coordination queries per discipline
- Elements specified in one document and absent in another
- Section-level status map
What to measure
- Conflicts confirmed by the design manager
- Site queries later raised on reviewed sections
- Review time per specification section
- Cost per section
Names of measures only. No result is claimed for this template.
Templates open in the workspace chat with the ask filled in. Nothing runs until you send it.
Get early accessSign in to useMore in Real estate and construction
Abstract a lease portfolio with amendments and conflicts shown
For: Asset manager, lease administrator or acquisitions analyst handling a property portfolio
Each lease comes with amendments, side letters and notices.
Level subcontractor bids against the scope, by specialist brief
For: Commercial manager, quantity surveyor or estimator comparing trade package bids
Bids for the same package arrive in different formats with different exclusions, qualifications and programme assumptions.
Stress-test a delay claim against the project record
For: Contracts manager or claims consultant preparing or defending an extension of time claim
The record of a delay is spread over site diaries, information requests, instructions, meeting minutes and letters.